A global green energy company, is committed to producing green, fossil-free hydrogen from 100% renewable resources. The company wishes to develop a green energy project in Kenya aimed at:
- supplying electricity from renewable resources, as well as producing green hydrogen and ammonia for domestic and international markets;
 - using the existing infrastructure and electricity transmission grid and developing a storage and export facility for finished products.
 
Seureca performed a pre-feasibility study covering water access and the infrastructure required by the hydrogen and ammonia production facility.
  
      
            Our solution
      
  The missions entrusted to Seureca concern:
- verifying the availability of the resource and infrastructure required to implement this project;
 - estimating costs (CAPEX/OPEX);
 - drawing up recommendations and technical specifications to define and optimise the design of the water treatment process and implementation schedule;
 - defining the approvals and compliance required to build and manage water supply and wastewater discharge from the production facility;
 - providing recommendations for waste management: dewatering and disposing sludge produced by water treatment plants;
 - taking safety into account in process design, including risk identification and management measures;
 - the constructability study integrating logistics and a preliminary schedule.
 